Primerail Infralabs |

RVNL: The term of reference of the project includes detailed engineering consultancy services for RVNL project construction of 3rd line between Ghorandongri (excluding) to chinchonda (excluding) (94km) central railway in the Itarsi-Nagpur section (94km). Scope of the work includes topographic survey, geotechnical investigation, site selection, complete design, and design of tunnel.