Primerail Infralabs |

Pune Metro Phase 1 and 2 (26 km): The project includes Design, Supply, Installation, Testing and Commissioning of Standard Gauge Ballasted Track in Range Hill Depot and Ballastless Track for the Elevated Section of Reach-1 (Pimpri Chinchwad Municipal Corporation (PCMC) to Range Hill) of Pune Metro Rail Project. Services provided by Primerail
  1. Review of Alignment and Best-Fit Alignment design of Vertical & Horizontal Alignment for both up and down lines with design speed of 90kmph.
  2. Design for Ballastless Track of 16t axle loading for straight, mild and sharp curves, check rail assembly, ballast-less turnouts track slab designs, constructions reference drawings, as-built drawings and rail interaction studies.
  3. Design for Ballasted Track including special track forms in Range Hill Depot.