Nagpur Metro Phase 1 & Phase 2
Nagpur Metro Phase 1 & Phase 2: The total project length is 82Tr.KM. The scope of the project included detailed design consultant services for Ballastless tracks design and drawings inclusion of supply, Installation, testing and commissioning of ballastless track of standard gauge phase-1, North-south corridor of line 1 (sitabuldi-khapri) & East West corridor of line […]
Hanoi Pilot Light Rail Metro
Hanoi Pilot Light Rail Metro (section Nhon to Hanoi Railway station). The total length of 12.5km, out of which Nhon to Hanoi Railway station with 8.5km of elevated section and 4.0km underground section. It has 12 stations with 8 elevated and 4 underground stations. The depot at Nhon with area of 150,550m2. Services provided by […]